The bathroom is a room with unique conditions: high humidity, humidity differences. That is why making repairs in the restroom, you should definitely plan the entire working process, to consider the sequence of steps to be achieved. In this guide, you will discover where to start the repair in the bathroom and what types of work ought to be carried out together with your own hands. Step-by-step directions for bathroom repair
Phase 1: Establishing a strategy and choosing a layout solution.
Repair in the toilet can be of two types:
- Unplanned, spontaneous, arising from the can of unforeseen circumstances. By way of instance, in the event of an pipe burst, flooding by neighbors.
- Planned, that is either capital or cosmetic. It requires planning, serious fiscal investment and time.
Begin repairs at the toilet is to find out the plan, interior. Think through to the last detail, what will be the room, choose a color. Pastel colours are conventional, in addition to a mix of blue and blue, black or cherry with beige.
Begin repairs in the bathroom is to ascertain the design, interior design. Consider detail, what will be the space, choose a colour. Pastel colors are thought to be traditional, as well as a blend of colors.
Next point is the choice of facing substance. As a rule, finishing at the bathroom is performed with vinyl, porcelain tiles, mosaicand vinyl panels. Examine the pipes, if it needs to be mended. If necessary, choose the right option. Proceed to the measuring function: quantify all sides, figure out the area of the room. Based on these data, we indicate the location of the plumbing fittings.
Measure 2: the selection of sanitary fixtures and substance for completing.
It’s important to realize that the purchase price of sanitary ware precedes the planning stage, and not vice versa. This usually means that first we create a design project, make a plan, and then go to the shop. Yet another point – you should specify the size of vsyakuhnya.ru your favorite plumbing fixtures and check the plan, whether it fits.
It is important to see that the cost of plumbing fittings is completed by a preparation period, rather than vice versa. This means that first we create a new design project, make a plan, then go to the store. Another one
As for materials for completing, it’s preferable to get them immediately for the entire repair cycle, so that you will not be diverted if something has been missing. Do not forget about preparing the necessary tools.
Measure 3: dismantling tiling and plumbing.
After all the preliminary work has been done, proceed to the Start of the task process:
- Eliminate the sink and bathtub from the room, even though they won’t be replaced with new ones. This way, you are able to keep them intact and clean.
- Eliminate the tile, cleaning after it all of surfaces: ceiling, walls, flooring.
- Remove old paint from the walls, if they had been formerly painted, since the glue solution or a new layer of paint won’t stick to the surface.
Measure 4: replacement of communications: pipes, electrical wiring.
Quite frequently in an old house, you should carefully inspect and replace not just the pipes which are in the bathroom itself, but in addition the most important riser, and at times the interfloor pipes. Why is it worth doing so? Old pipes anytime can give a flow, and then the new repair is going to be spoiled, it is going to require additional investment to eliminate defects.